Aversan developed a fully automated system to help Safran Messier-Bugatti-Dowty improve landing gear production productivity and efficiency by reducing the production acceptance test cycle time. The ATE was able to automate test execution, collect data, and generate reports. Aversan was able to: • Rapid 2 year ROI • Reduce test cycle duration from 2 hours per unit, to 5 minutes – 95% reduction in cycle duration • Significantly reduce manual effort and human error • Increase productivity and throughput • Create a scalable design to allow for growth opportunities and production line connectivity